|
|
|

 |
The
uppermost section
One needed per chute system
Entry point for debris
|
 |
Sections for mult-level work
Any number per system
Entry point for debris
Adjust height using Door Adjustment Kit
|
 |
Tube sections
A system consists mostly of these pieces
|
All
sections are slightly tapered tubes, 4 feet in height, 27
in. diameter.
Because all linked sections overlap a little, 3 sections
provide 10 ft. of drop.
All sections are equipped with safe & strong cable linking
hardware.
We lease as well as sell new and used chutes.
|
 |
Seacoast Scaffold
& Equipment Corporation |
163 Thadeus Street,
South Portland, ME 04106
(207)799-9800 (800)639-5042 Fax (207)799-9855
243 Sheep Davis
Road, Concord, NH 03302
(603)224-0999 (888)701-1119 Fax (603)224-1414
Email: info@seacoastscaffold.com

|